A 450 kW rooftop and carport solar project for our strategic partner, Inplass, in Salcedo, Ecuador, transforming their plastics factory into a self-sustaining facility.

Challenge

In Salcedo, Cotopaxi, Ecuador, Inplass, our strategic client, has partnered with us to deliver a landmark 450 kW solar energy project. Inplass is not only a key client of EGE in the region but also a forward-thinking industrial player. This project showcases their commitment to sustainability by integrating our solar technology directly into their own plastics factory, turning previously unused rooftop space and a new carport into a powerful energy-generating asset. This case study details how EGE’s comprehensive product range is helping power a greener industrial sector in Ecuador.

Balancing Industrial Growth with Energy Demands

Inplass faced a set of challenges common to many modern industrial operations. The continuous manufacturing process of a plastics factory requires a stable and uninterrupted power supply. Any fluctuation or outage can lead to significant production losses. Key challenges included:
  • Rising Energy Costs: Increasing reliance on the grid exposed the factory to volatile and escalating electricity prices, impacting operational overhead.
  • Energy Reliability: The need for a consistent power source to maintain continuous production schedules and avoid costly downtime was paramount.
  • Sustainability Goals: As a modern manufacturer, Inplass aimed to reduce its carbon footprint and align its brand with environmentally responsible practices, contributing to Ecuador’s greener industrial ambitions.

Our Solution

A Comprehensive 450 kW Solar Installation

Eco Green Energy was asked to deliver a complete, turnkey solar project solution to transform Inplass’s factory into a hub of clean energy generation. We offered products was engineered to maximize output, ensure long-term reliability, and integrate seamlessly with existing infrastructure.

Project Specifications

  • PV System: A powerful 450 kW array comprising 818 high-performance 550W EGE modules.
  • Inverters: 150 kW on-grid inverters to efficiently convert DC power to AC for factory use.
  • Infrastructure: Custom panel rooftop brackets and a solar carport structure to optimize space utilization.
  • Balance of System: Complete supply of PV cabinets, cables, connectors, and cable basket trays for a safe and durable installation.

Implementation Highlights

  • Turnkey Solution: EGE provided all major components, ensuring compatibility and quality across the entire system.
  • Dual-Use Infrastructure: The project utilized both the factory’s unused rooftop and a newly constructed carport, which provides the dual benefit of generating power and offering shaded parking.
  • Ongoing Support: The solution includes a plan for  dedicated support to ensure optimal performance.

Conclusion: A Model for Industrial Sustainability

The successful implementation of the 450 kW solar project at the Inplass factory delivers immediate and long-term benefits. By generating its own clean energy, Inplass has achieved significant cost savings, gained greater energy independence, and enhanced its brand as a sustainable leader in the plastics industry. This project serves as a powerful testament to how industrial facilities can leverage solar technology to reduce operating expenses, improve energy reliability, and contribute to a greener planet.

Installed Capacity

450kW

Connection date to the grid 

2024

PV module power

550W

Similar Projects

About our company

French High-tech PV development since 2008

Get your customized offer

Start today!

Take part in the green energy revolution and receive your customized offer