1 MW / 2 MWh BESS for Industrial Peak Shaving in Poland

Commercial & Industrial

Eco Green Energy’s battery energy storage project at a steelworks in Poland addresses a specific industrial requirement: managing short electricity demand peaks during furnace start-up.

The installation combines eight GAIA Core AIO units in parallel, providing 1 MW of rated power and 2,088 kWh of nominal storage capacity, approximately 2 MWh. Installed in an AC-coupled retrofit configuration, the BESS adds energy storage to the site’s existing electrical infrastructure.

The project illustrates how battery storage can be configured around an industrial load profile and a contracted grid power limit.

Outdoor battery cabinets on a raised platform at the BESS project in Poland.

Challenge

Managing the peak, not increasing the grid connection

At the steelworks, starting the furnaces could push electricity demand above the site’s contracted power limit, resulting in additional charges. Increasing that limit was not an available option.

The challenge was therefore to manage brief increases in demand while working within the existing contracted grid power. These peaks required a solution capable of supporting the electrical load during furnace start-up.

The project’s operating requirements also included charging from two sources: the grid at night and solar PV during the day. Battery storage provides a way to retain that energy for use during demand peaks.

Our Solution

The solution combines eight GAIA Core AIO battery units, each rated at 125 kW and 261 kWh. Connected in parallel, they provide a combined rated power of 1 MW and a nominal energy capacity of 2,088 kWh.

Supporting furnace start-up demand

During demand peaks, the BESS discharges to support the steelworks’ electrical load and help limit the power drawn from the grid. This peak-shaving application addresses the short periods when furnace start-up could cause the contracted limit to be exceeded.

Combining grid and solar charging

The system charges from the grid at night and from solar PV during the day. Stored energy is then available to support the site during demand peaks, adding flexibility to the way electricity is supplied to the industrial process.

The installation brings together a modular battery configuration, two charging sources and a defined operational purpose: supporting an industrial site’s peak demand within its contracted grid power.

Open battery cabinet showing internal equipment at the project in Poland.

Frequently asked questions

What challenge does the BESS address?

The BESS supports furnace start-up demand at a steelworks where short power peaks could exceed the contracted grid limit and trigger additional charges.

How much energy can the system store?

The eight 261 kWh units provide a combined nominal capacity of 2,088 kWh, commonly presented as approximately 2 MWh. Combined rated power is 1 MW.

Discuss your BESS project

Installed Capacity

1 MW / 2 MWh

Connection date to the grid 

2026

PV module power

Similar Projects

About our company

French High-tech PV development since 2008

Get your customized offer

Start today!

Take part in the green energy revolution and receive your customized offer